Our Gallery

Bridge installed at Swatara State Park

       
400 ton luffing jib and super lift assembly.
400 ton raised 412 feet with full luffing jib.
240 ton setting precast box culvert in Clifford, PA.
275 and 240 ton cranes setting bridge beams over the Susquehanna River in Wyoming, PA.
 
115 ton setting a modular home in place.
60 ton lifting backup generator at Prime Trucking in Pittston PA.
240 ton placing a lighting protection system
Boom truck removing roofing equipment in Wilkes-Barre, PA.
20 ton portable gantry lifting air handling sections
80,000 lb forklift unloading mechanical equipment off a flatbed.
275 and 240 ton cranes replacing turbine on a windmill in Waymart, PA